Greater Gabbard Offshore Wind Farm
In 2009 Seajacks delivered the Leviathan to Fluor LTD to begin work on the Greater Gabbard Wind Farm, situated 25km off the East Coast of England.
The first part of the project was the hook-up and commissioning of an offshore substation. Leviathan then engaged in installation, in total fitting 105 WTGs, 9 TPs and one met mast.
Seajacks’ work on the wind farm can be seen in the below videos.